New septic systems in Limestone County
Soil first, then the design, then the permit. We handle each one.
Starting a new system
A new septic system starts with the soil. A soil evaluation tells us what the ground will take, and the design follows: a conventional tank and field where the soil allows, an aerobic system where it doesn't. Professional design by an engineer or sanitarian is required for proprietary and non-standard systems.
In the county
Applications go to Limestone County in Groesbeck. Every system needs an approved floodplain review, which can be filed ahead of time or with the septic application. Aerobic systems need an affidavit to the public recorded with the county clerk before the application is filed. After approval comes an authorization to construct, good for one year, and an inspection before the system is covered. See the county's permit instructions.
Inside Kosse
The City of Kosse handles septic permits inside its own limits.
Near the lake
In the Lake Limestone regulated area the Brazos River Authority is the permitting office. Lake Limestone details.